Bebop Riedberg
Frankfurt am Main,
2012
- Phases: 1 - 4
- Planingtime: 2012 - 2015
- BGF: 1,774 m2
- BRI: 5,298 m3
- Building contractor: LID, Lechner Immobilien Development GmbH
The six linked town houses were built in the framework of a quality campaign conducted by Riedberg west wing. With their differentiated number of storeys and organically animated building form, they enrich the quarter with high-quality architecture.
The change in the different number of storeys of the terraced houses creates new and exciting formulations of the terraced house type.
Each residential building has a spacious front garden and entrance area, parking spaces integrated in the building and an own garden with tool shed.
Project Management: Pia Moltzen
Project Manager: Andrea Stenzel
Team: Hannes Fischer-Schadzik, Stefan Weitzel, Miriam Müller, Pia Schneider