Linked town houses Jazz
Frankfurt am Main,
2012
- Phases: 1 - 4
- Planingtime: 2012 - 2014
- BGF: 1,390 m2
- BRI: 4,030 m3
- Building contractor: LID Lechner Immobilien Development GmbH
The 14 high-quality linked town houses form the eastern edge of the inner ensemble of Riedberg west wing and are located directly on the continuous north-south green corridor. The cut of the parcels and the layout of the buildings have been chosen in such a way that the terraces and gardens have a perfect south-west orientation. Moreover, this slight slant ensures a pleasant staggered arrangement and structure of the rows of houses. Each house has its own twin parking lot.
Project Management: Robert Müller, Pia Moltzen
Project Manager: Anita May
Team: Andrea Stenzel, Fatma Esmer, Pia Schneider, Viktor Neufeld